From Gary & Terry - Page 2
 

Home Up


 

    More pictures of our Christmas present in progress...

Day 3 - November 18th, 2007

The front wall with a coat of paint. The hallway wall with a coat of paint.
The kitchen wall with a coat of paint. Tyler working his way up the scaffolding.
Tyler almost at the top with Grandpa. Tyler and Grandpa standing on the scaffolding.
 

Day 4 - November 19th, 2007

Tyler had his turn yesterday, so today it was Samantha's turn to climb up with Grandpa. Mom didn't turn on the flash, so I apologize for the blurry pictures.
 

Day 5 - November 20th, 2007

The back door area all finished. The hallway wall and ceiling all finished.
The front wall and kitchen wall intersection. The front wall near the doorway after it was completed.
The hallway all finished.
 

Finished Product - November 20th, 2007

The hallway wall. The front wall.
The entry area. The kids picture area (minus Jayden's, which should be coming in a couple of months).
The back door wall. Another picture of the hallway wall.
 

 

[Home] [Up] [Current Events] [Past Events] [Studio Photos] [Blog] [Update List]

 

© Copyright 1999-2024 by RodandTara.com. All Rights Reserved.
No portion of this site may be redistributed in any form via any medium.